[gammanoles] SB3 & SB4 P&B initiated...
S. L. Tabor
tabor at nucmar.physics.fsu.edu
Tue Oct 31 14:35:48 EDT 2017
Thanks.
On 10/31/2017 02:34 PM, Powell Barber wrote:
> SB3 and SB4 have been installed on the anneal station. SB4 was pumped down, having been vented, and I’ll probably open up to SB3 when we hit mid 10E-5 Torr, as it is still somewhat cold. Apply heat at 80degC tomorrow morning, vacuum permitting, and cook as long as permissible prior to my vacation Thanksgiving week.
>
> cheers,
>
> p.
>
>
>
> _______________________________________________
> Gammanoles mailing list
> Gammanoles at lists.fsu.edu
> https://lists.fsu.edu/mailman/listinfo/gammanoles
>
More information about the Gammanoles
mailing list