[gammanoles] Clover # 2 started...
Vandana Tripathi
vtripath at fsu.edu
Wed Oct 27 16:05:08 EDT 2021
thanks ..
________________________________
From: Gammanoles <gammanoles-bounces at lists.fsu.edu> on behalf of Powell Barber via Gammanoles <gammanoles at lists.fsu.edu>
Sent: Wednesday, October 27, 2021 3:43 PM
To: FSU Physis Gamma Ray Spectrocopy Group <gammanoles at lists.fsu.edu>
Cc: Powell Barber <pbarber at fsu.edu>; Soumik Bhattacharya <sbhattacharya3 at fsu.edu>
Subject: [gammanoles] Clover # 2 started...
All (who care) -
Clover # 2 was installed on the anneal station today. I observed significant gas load on opening to the sorption pump, however the system pressure was mid 10E-5 Torr after ~ 10 mins on the turbo and progressing downward. Plan to pump overnight, see what base pressure we get, and determine how to proceed from there.
cheers,
p.
_______________________________________________
Gammanoles mailing list
Gammanoles at lists.fsu.edu
https://lists.fsu.edu/mailman/listinfo/gammanoles
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.fsu.edu/pipermail/gammanoles/attachments/20211027/87354682/attachment.html>
More information about the Gammanoles
mailing list