From pbarber at fsu.edu Wed Oct 27 15:43:16 2021 From: pbarber at fsu.edu (Powell Barber) Date: Wed, 27 Oct 2021 19:43:16 +0000 Subject: [gammanoles] Clover # 2 started... Message-ID: <3D9FF838-EF19-430E-A4D3-38E035BC77CB@fsu.edu> All (who care) - Clover # 2 was installed on the anneal station today. I observed significant gas load on opening to the sorption pump, however the system pressure was mid 10E-5 Torr after ~ 10 mins on the turbo and progressing downward. Plan to pump overnight, see what base pressure we get, and determine how to proceed from there. cheers, p. From stabor at fsu.edu Wed Oct 27 15:58:02 2021 From: stabor at fsu.edu (tabor) Date: Wed, 27 Oct 2021 15:58:02 -0400 Subject: [gammanoles] Clover # 2 started... In-Reply-To: <3D9FF838-EF19-430E-A4D3-38E035BC77CB@fsu.edu> References: <3D9FF838-EF19-430E-A4D3-38E035BC77CB@fsu.edu> Message-ID: Thanks, Powell. On 10/27/21 15:43, Powell Barber via Gammanoles wrote: > All (who care) - > > Clover # 2 was installed on the anneal station today. I observed significant gas load on opening to the sorption pump, however the system pressure was mid 10E-5 Torr after ~ 10 mins on the turbo and progressing downward. Plan to pump overnight, see what base pressure we get, and determine how to proceed from there. > > cheers, > > p. > _______________________________________________ > Gammanoles mailing list > Gammanoles at lists.fsu.edu > https://lists.fsu.edu/mailman/listinfo/gammanoles From vtripath at fsu.edu Wed Oct 27 16:05:08 2021 From: vtripath at fsu.edu (Vandana Tripathi) Date: Wed, 27 Oct 2021 20:05:08 +0000 Subject: [gammanoles] Clover # 2 started... In-Reply-To: <3D9FF838-EF19-430E-A4D3-38E035BC77CB@fsu.edu> References: <3D9FF838-EF19-430E-A4D3-38E035BC77CB@fsu.edu> Message-ID: thanks .. ________________________________ From: Gammanoles on behalf of Powell Barber via Gammanoles Sent: Wednesday, October 27, 2021 3:43 PM To: FSU Physis Gamma Ray Spectrocopy Group Cc: Powell Barber ; Soumik Bhattacharya Subject: [gammanoles] Clover # 2 started... All (who care) - Clover # 2 was installed on the anneal station today. I observed significant gas load on opening to the sorption pump, however the system pressure was mid 10E-5 Torr after ~ 10 mins on the turbo and progressing downward. Plan to pump overnight, see what base pressure we get, and determine how to proceed from there. cheers, p. _______________________________________________ Gammanoles mailing list Gammanoles at lists.fsu.edu https://lists.fsu.edu/mailman/listinfo/gammanoles -------------- next part -------------- An HTML attachment was scrubbed... URL: