From mgans at fsu.edu Mon Jan 8 14:18:15 2024 From: mgans at fsu.edu (Mitch Gans) Date: Mon, 8 Jan 2024 19:18:15 +0000 Subject: [Its-generator-contacts] 1/12 Sliger Data Center EPO Bypass Switch Test In-Reply-To: References: Message-ID: Please be advised that the EPO bypass switch test has been rescheduled to 8:30 am on Friday morning, January 12, 2024. At 8:30 am on Friday morning, January 12, 2024, Orr Protection will be executing a test of the emergency power-off (EPO) bypass switch that was recently installed, to prevent possibility of recurrence of the power-off issue we experienced on October 10, 2021. We have scheduled this additional test to provide us all with assurance that the remediation was successful, before resuming data center fire suppression system inspections. Since we are testing a new switch that prevents execution of a power-off condition, we are very comfortable with executing this extremely low-risk test before the next fire suppression system inspection, and even more confident about its success. After completion of the EPO bypass switch test, we will provide you all with a date and time of the next semi-annual inspection of the data center's fire suppression system. Thanks, Mitch The SGT's Greenletter [cid:image001.jpg at 01DA423D.8470BC70] [cid:image002.gif at 01DA423D.8470BC70] Mitch Gans Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Sliger Data Center: (850) 644-8555 Fax: (850) 644-8722 From: Mitch Gans Sent: Wednesday, November 29, 2023 3:21 PM To: its-colocation-customers at lists.fsu.edu Cc: its-generator-contacts at lists.fsu.edu; Paul Van Der Mark Subject: 1/9 Sliger Data Center EPO Bypass Switch Test Please be advised that at 8:30 am on Tuesday morning, January 9, 2024, Orr Protection will be executing a test of the emergency power-off (EPO) bypass switch that was recently installed, to prevent possibility of recurrence of the power-off issue we experienced on October 10, 2021. We have scheduled this additional test to provide us all with assurance that the remediation was successful, before resuming data center fire suppression system inspections. Since we are testing a new switch that prevents execution of a power-off condition, we are very comfortable with executing this extremely low-risk test before the next fire suppression system inspection, and even more confident about its success. After completion of the EPO bypass switch test, we will provide you all with a date and time of the next semi-annual inspection of the data center's fire suppression system. Thanks, Mitch The SGT's Greenletter [cid:image001.jpg at 01DA423D.8470BC70] [cid:image002.gif at 01DA423D.8470BC70] Mitch Gans Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Sliger Data Center: (850) 644-8555 Fax: (850) 644-8722 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 7858 bytes Desc: image001.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.gif Type: image/gif Size: 3078 bytes Desc: image002.gif URL: From mgans at fsu.edu Fri Jan 12 08:43:35 2024 From: mgans at fsu.edu (Mitch Gans) Date: Fri, 12 Jan 2024 13:43:35 +0000 Subject: [Its-generator-contacts] 1/12 Sliger Data Center EPO Bypass Switch Test In-Reply-To: References: Message-ID: This morning's test of the recently installed EPO bypass switch was successful, with no issues encountered. Mitch The SGT's Greenletter [cid:image001.jpg at 01DA4533.6D2DFCF0] [cid:image002.gif at 01DA4533.6D2DFCF0] Mitch Gans Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Sliger Data Center: (850) 644-8555 Fax: (850) 644-8722 From: Mitch Gans Sent: Monday, January 8, 2024 2:18 PM To: its-colocation-customers at lists.fsu.edu Cc: its-generator-contacts at lists.fsu.edu; Paul Van Der Mark Subject: 1/12 Sliger Data Center EPO Bypass Switch Test Please be advised that the EPO bypass switch test has been rescheduled to 8:30 am on Friday morning, January 12, 2024. At 8:30 am on Friday morning, January 12, 2024, Orr Protection will be executing a test of the emergency power-off (EPO) bypass switch that was recently installed, to prevent possibility of recurrence of the power-off issue we experienced on October 10, 2021. We have scheduled this additional test to provide us all with assurance that the remediation was successful, before resuming data center fire suppression system inspections. Since we are testing a new switch that prevents execution of a power-off condition, we are very comfortable with executing this extremely low-risk test before the next fire suppression system inspection, and even more confident about its success. After completion of the EPO bypass switch test, we will provide you all with a date and time of the next semi-annual inspection of the data center's fire suppression system. Thanks, Mitch The SGT's Greenletter [cid:image001.jpg at 01DA4533.6D2DFCF0] [cid:image002.gif at 01DA4533.6D2DFCF0] Mitch Gans Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Sliger Data Center: (850) 644-8555 Fax: (850) 644-8722 From: Mitch Gans Sent: Wednesday, November 29, 2023 3:21 PM To: its-colocation-customers at lists.fsu.edu Cc: its-generator-contacts at lists.fsu.edu; Paul Van Der Mark > Subject: 1/9 Sliger Data Center EPO Bypass Switch Test Please be advised that at 8:30 am on Tuesday morning, January 9, 2024, Orr Protection will be executing a test of the emergency power-off (EPO) bypass switch that was recently installed, to prevent possibility of recurrence of the power-off issue we experienced on October 10, 2021. We have scheduled this additional test to provide us all with assurance that the remediation was successful, before resuming data center fire suppression system inspections. Since we are testing a new switch that prevents execution of a power-off condition, we are very comfortable with executing this extremely low-risk test before the next fire suppression system inspection, and even more confident about its success. After completion of the EPO bypass switch test, we will provide you all with a date and time of the next semi-annual inspection of the data center's fire suppression system. Thanks, Mitch The SGT's Greenletter [cid:image001.jpg at 01DA4533.6D2DFCF0] [cid:image002.gif at 01DA4533.6D2DFCF0] Mitch Gans Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Sliger Data Center: (850) 644-8555 Fax: (850) 644-8722 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 7858 bytes Desc: image001.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.gif Type: image/gif Size: 3078 bytes Desc: image002.gif URL: From mgans at fsu.edu Tue Jan 16 09:30:32 2024 From: mgans at fsu.edu (Mitch Gans) Date: Tue, 16 Jan 2024 14:30:32 +0000 Subject: [Its-generator-contacts] 1/25 BFS Generator Load Transfer Test In-Reply-To: References: Message-ID: The Sliger Building Generator Load Transfer Test will be conducted at 8:10 am on Thursday, January 25, 2024. This notification serves as a scheduling reminder to interested parties at FSU Facilities, Research Computing Center, et al. Mitch RCC @ FSU now recycles can rings [cid:image001.jpg at 01DA4572.C2C57640] [cid:image002.gif at 01DA4572.C2C57640] Mitch Gans Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Sliger Data Center: (850) 644-8555 Fax: (850) 644-8722 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 7858 bytes Desc: image001.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.gif Type: image/gif Size: 3078 bytes Desc: image002.gif URL: From mgans at fsu.edu Wed Jan 17 13:18:26 2024 From: mgans at fsu.edu (Mitch Gans) Date: Wed, 17 Jan 2024 18:18:26 +0000 Subject: [Its-generator-contacts] 1/22 BFS Fire Suppression System Inspection Message-ID: Good afternoon, Please be advised that Orr Protection will be on site to conduct inspection of the Sliger Building Data Center's fire suppression system at 8 am on Monday, January 22, 2024. With the newly installed and tested EPO bypass switch since building renovations, we anticipate a normal, uninteresting procedure and resumption of semi-annual inspections afterwards. Thanks, Mitch The SGT's Greenletter [cid:image001.jpg at 01DA4945.E722F590] [cid:image002.gif at 01DA4945.E722F590] Mitch Gans Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Sliger Data Center: (850) 644-8555 Fax: (850) 644-8722 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 7858 bytes Desc: image001.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.gif Type: image/gif Size: 3078 bytes Desc: image002.gif URL: From mgans at fsu.edu Fri Jan 26 09:44:35 2024 From: mgans at fsu.edu (Mitch Gans) Date: Fri, 26 Jan 2024 14:44:35 +0000 Subject: [Its-generator-contacts] 2024 Sliger Building Generator Load Test Schedule In-Reply-To: References: Message-ID: This is our 2024 Sliger Generator load testing schedule, at 8:10 am on these Thursdays: February 29 March 28 April 25 (skip - last week of regular term) May 30 June 27 July 25 August 29 (skip - first week of classes) September 26 October 31 November 28 (skip - Thanksgiving) December 26 (skip - Winter Break) Thanks, Mitch RCC @ FSU now recycles can rings [cid:image001.jpg at 01D8ED11.68EDC6F0] [cid:image002.gif at 01D8ED11.68EDC6F0] Mitch Gans Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Sliger Data Center: (850) 644-8555 Fax: (850) 644-8722 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 7858 bytes Desc: image001.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.gif Type: image/gif Size: 3078 bytes Desc: image002.gif URL: