From mgans at fsu.edu Tue Jun 15 09:30:59 2021 From: mgans at fsu.edu (Mitch Gans) Date: Tue, 15 Jun 2021 13:30:59 +0000 Subject: [Its-generator-contacts] 6/24 Sliger Building Generator Load Transfer Test Message-ID: Please be advised that we will be conducting a Sliger Building Generator Load Transfer Test beginning at 7:00 am on Thursday, June 24, which will last less than an hour. Any electronic devices outside the Sliger Building Data Center without battery backup will experience a power outage at 7:00 am as the generator starts up. Should we experience any problems during this test, Facilities will be on-site and prepared to resolve them so that all power is restored before 8:00 am. Mitch Gans Asst. Director, Information Technology Services Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Office: (850) 644-2591 Cell: (850) 591-6193 Fax: (850) 644-8722 -------------- next part -------------- An HTML attachment was scrubbed... URL: From mgans at fsu.edu Wed Jun 30 09:25:32 2021 From: mgans at fsu.edu (Mitch Gans) Date: Wed, 30 Jun 2021 13:25:32 +0000 Subject: [Its-generator-contacts] 6/24 Sliger Building Generator Load Transfer Test In-Reply-To: References: Message-ID: Good morning, Last Thursday's successful Generator Load Transfer Test was the first one since power renovations at Sliger Building a couple weeks ago. Unlike during previous Generator tests, your office equipment outside the Data Center was unaffected during this test, because there was no transition of the entire building to Generator. This means that during future Generator tests, your electronic equipment will remain up, we will not need to warn you that you will briefly lose power, and only equipment in the Data Center will be on Generator. This also means that during City power outages, your office equipment will not be on Generator and it will be off the entire time of the outage. For future issues and concerns regarding power outages, please contact the City of Tallahassee at 850-891-4968 or 711 (TDD). Thanks, Mitch Mitch Gans Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Office: (850) 644-8555 Cell: (850) 591-6193 Fax: (850) 644-8722 From: Mitch Gans Sent: Tuesday, June 15, 2021 9:31 AM Subject: 6/24 Sliger Building Generator Load Transfer Test Please be advised that we will be conducting a Sliger Building Generator Load Transfer Test beginning at 7:00 am on Thursday, June 24, which will last less than an hour. Any electronic devices outside the Sliger Building Data Center without battery backup will experience a power outage at 7:00 am as the generator starts up. Should we experience any problems during this test, Facilities will be on-site and prepared to resolve them so that all power is restored before 8:00 am. Mitch Gans Asst. Director, Information Technology Services Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Office: (850) 644-2591 Cell: (850) 591-6193 Fax: (850) 644-8722 -------------- next part -------------- An HTML attachment was scrubbed... URL: