From mgans at fsu.edu Tue Mar 17 13:49:27 2020 From: mgans at fsu.edu (Mitch Gans) Date: Tue, 17 Mar 2020 17:49:27 +0000 Subject: [Its-generator-contacts] 3/26 Sliger Building Generator Load Transfer Test Message-ID: Please be advised that we will be conducting a Sliger Building Generator Load Transfer Test beginning at 7:00 am on Thursday, March 26, which will last less than an hour. Any electronic devices outside the Sliger Building Data Center without battery backup will experience a power outage at 7:00 am as the generator starts up. Should we experience any problems during this test, Facilities will be on-site and prepared to resolve them so that all power is restored before 8:00 am. Mitch Gans Asst. Director, Information Technology Services Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Office: (850) 644-2591 Cell: (850) 591-6193 Fax: (850) 644-8722 -------------- next part -------------- An HTML attachment was scrubbed... URL: From mgans at fsu.edu Wed Mar 18 09:09:37 2020 From: mgans at fsu.edu (Mitch Gans) Date: Wed, 18 Mar 2020 13:09:37 +0000 Subject: [Its-generator-contacts] 3/26 Sliger Building Generator Load Transfer Test -- CANCELLED Message-ID: Good morning, It has come to our attention that this month's planned Generator Test at Sliger Building would present undue hardship for building residents who must work remotely at this time, so the March 2020 Sliger Building Generator Load Transfer Test has been cancelled. Mitch Mitch Gans Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Office: (850) 644-0066 Cell: (850) 591-6193 Fax: (850) 644-8722 From: Mitch Gans Sent: Tuesday, March 17, 2020 1:49 PM To: 'its-generator-contacts at lists.fsu.edu' Subject: 3/26 Sliger Building Generator Load Transfer Test Please be advised that we will be conducting a Sliger Building Generator Load Transfer Test beginning at 7:00 am on Thursday, March 26, which will last less than an hour. Any electronic devices outside the Sliger Building Data Center without battery backup will experience a power outage at 7:00 am as the generator starts up. Should we experience any problems during this test, Facilities will be on-site and prepared to resolve them so that all power is restored before 8:00 am. Mitch Gans Asst. Director, Information Technology Services Florida State University 2035 E. Paul Dirac Drive Tallahassee, FL 32306-2760 mgans at fsu.edu Office: (850) 644-2591 Cell: (850) 591-6193 Fax: (850) 644-8722 -------------- next part -------------- An HTML attachment was scrubbed... URL: